Blog

March 17, 2022

Dinslaken: New wood power plant with BERTHOLD technology

The construction work is still in full swing, but from 2023 the wood energy center in Dinslaken/NRW will supply almost climate-neutral energy. BERTHOLD’s tried-and-tested BLS logistics control system will ensure safe and economical handling of the transport logistics. BERTHOLD has earned an excellent reputation among operators and planners of thermal power plants. State-of-the-art and field-tested […]

Read more
March 17, 2022

Another major order from ROHRDORFER

ROHRDORFER commissioned BERTHOLD to modernize the production control technology of the mixing plant controls at 3 locations. The important building materials producer is thus intensifying its cooperation with the Austrian high-tech company BERTHOLD. BERTHOLD already managed an important coup in spring 2021 with the timely handover of its BLS logistics control system at 8 ROHRDORFER […]

Read more
December 6, 2021

Annual report 2021 – Joachim Berthold at the turn of the year

Dear readers, 2020 was already an exceptional year for us, but 2021 held even greater challenges in store. It was a busy year for BERTHOLD, but against all odds, a positive year! We faced delivery bottlenecks and price increases from suppliers, as well as “lockdowns”. But with foresight and meticulous preparation, we succeeded in realizing […]

Read more
October 20, 2021

Wien Energie uses BLS logistics control system to optimize calorific value

What does a logistics control system have to do with calorific value optimization? More than you think, at least with waste incineration plants. Here is a brief history of BERTHOLD’s ongoing projects at Wien Energie: Wien Energie operates all 4 waste incineration plants in Vienna. A profound team of experts is constantly working on optimizations […]

Read more
October 20, 2021

Opening ceremony of the wood power plant Aarberg / Switzerland

Joint successes should be celebrated together: The Swiss wood power plant Aarberg AG invited to the opening ceremony of the newly built wood power plant. Also there: the high-tech company BERTHOLD from Austria. The Aarberg wood-fired power plant has been running successfully in full operation since January 2021. Thanks to the extremely good cooperation between […]

Read more
July 20, 2021

Baumit expands automated shipping logistics

The Austrian building materials manufacturer Baumit is investing in a further expansion of transport logistics. The delivery plant in Bad Ischl will be equipped with the BLS logistics control system from BERTHOLD and integrated into the central processing. Baumit is one of the largest manufacturers of building materials in Europe, the headquarters are in Wopfing […]

Read more
RB-Blog-Leube-st-leonhard-Logistik-Verkehrsleitsystem-yardmanagement-hofsystem-logistikleitsystem
July 20, 2021

The Leube cement plant is modernizing with BERTHOLD

The largest cement plant in the Salzburg region invests in the most modern transport logistics: With the BLS logistics control system from BERTHOLD, Leube is relying on leading and future-proof technology. Quality cement products and consistent investment in the most modern technologies secure a strong market position for the Leube Group. In April 2021, Leube […]

Read more
April 17, 2021

Control engineering projects

BERTHOLD has been a recognized specialist in control technology for many years. Ongoing system support and regular follow-up orders from existing customers show that BERTHOLD is a reliable partner in this regard. With WTG further orders with banknote printers Together with the close partner Water Treatment GmbH (WTG) as general contractor, two further important projects […]

Read more
April 17, 2021

Sporty time frame met: BLS logistics control system at ROHRDORFER in full operation

In the middle of the pandemic, the Austrian high-tech company BERTHOLD succeeded in converting the ROHRDORFER cement division completely and on schedule to the future-oriented BLS logistics control system. After completion of all work and a 4-week trial phase, the BLS logistics control system from BERTHOLD went into full operation as planned at ROHRDORFER in […]

Read more
April 17, 2021

Successful project handover at Limeco

The BLS logistics control system was officially handed over to Limeco at the end of September 2020: The project was planned and implemented by BERTHOLD in record time. Nevertheless, the project was carried out in the usual high quality. As reported, Limeco, as a regional plant in the Limmattal / CH, invested in a modern […]

Read more
1 2 3 6